Road work continued slowly but surely this week. Work was hampered by some heavy rains, and crews were further delayed by the discovery of several shallow electrical and water lines that were discovered buried under Lake Road. The lake water irrigation system was also damaged and has been turned off. This will be repaired as soon as possible. Check back soon for updates on the progress.